| The documents listed below represent an electronic copy of modifications to the contract for the Idaho Cleanup Project (ICP). These documents are in PDF format. The Adobe Reader is required to access them. If you do not currently have the Acrobat Reader, you may download the Reader FREE by clicking on the icon at left. |
|
NUMBER |
DATE SIGNED | DESCRIPTION | File Size (in KB) |
| A001 | March 23, 2005 | Funding | 94 |
| A002 | April 5, 2005 | Funding | 96 |
| A003 | April 29, 2005 | Funding | 155 |
| A004 | June 10, 2005 | Funding | 181 |
| M005 | June 30, 2005 | Redistribute Program Funding | 130 |
| M006 | August 22, 2005 | Administrative Changes | 163 |
| Attachment (1) to M006 | Section J, Attachment B | 767 | |
| Attachment (2) to M006 | Section J, Attachment G | 182 | |
| A007 | July 28, 2005 | Funding | 161 |
| A008 | August 23, 2005 | Funding | 189 |
| A009 | August 30, 2005 | Funding | 223 |
| M010 | September 20, 2005 | Subcontract Approval | 107 |
| M011 | October 3, 2005 | Service Credit | 107 |
| A012 | September 30, 2005 | Funding | 218 |
| M013 | October 25, 2005 | Clause Added | 407 |
| A014 | October 27, 2005 | Funding | 267 |
| A015 | November 21, 2005 | Funding | 172 |
| A016 | December 23, 2005 | Funding | 160 |
| M017 | February 7, 2006 | Section B.5 - FY05-06 | 284 |
| A018 | January 18, 2006 | Funding | 181 |
| M019 | February 6, 2006 | List B Update | 902 |
| A020 | February 2, 2006 | Funding | 284 |
| A021 | March 14, 2006 | Funding | 232 |
| A022 | May 9, 2006 | Section B.5 | 415 |
| A023 | May 18, 2006 | Funding | 217 |
| A024 | June 22, 2006 | Funding | 213 |
| A025 | June 29, 2006 | Funding | 189 |
| M026 | August 21, 2006 | List B Update | 364 |
| A027 | August 1, 2006 | Funding | 229 |
| A028 | August 30, 2006 | Funding | 167 |
| A029 | September 11, 2006 | Funding | 213 |
| M030 | September 22, 2006 | Pension | 132 |
| A031 | September 25, 2006 | Funding | 198 |
| A032 | September 29, 2006 | Funding | 233 |
| A033 | September 29, 2006 | Funding | 233 |
| M034 | October 3, 2006 | Key Personnel Change | 109 |
| A035 | October 19, 2006 | Funding | 227 |
| M036 | January 18, 2007 | Section B.10 | 227 |
| Attachment to M036 | Section C | 182 | |
| A037 | October 30, 2006 | Funding | 215 |
| A038 | December 20, 2006 | Funding | 216 |
| M039 | January 8, 2007 | Section B.5 | 932 |
| M040 | March 7, 2007 | List B Update | 362 |
| A041 | January 18, 2007 | Funding | 183 |
| A042 | February 27, 2007 | Funding | 207 |
| A043 | March 15, 2007 | Funding | 219 |
| M044 | July 13, 2007 | Section B.5 | 246 |
| A045 | April 6, 2007 | Funding | 181 |
| A046 | April 25, 2007 | Funding | 220 |
| A047 | August 2, 2007 | Funding | 265 |
| M048 | August 15, 2007 | List B Update | 886 |
| A049 | August 13, 2007 | Funding | 185 |
| M050 | September 20, 2007 | List B Update | 423 |
| A051 | September 4, 2007 | Funding | 217 |
| A052 | September 6, 2007 | Funding | 187 |
| M053 | December 5, 2007 | Section B.5 | 256 |
| A054 | September 11, 2007 | Funding | 190 |
| A055 | September 27, 2007 | Funding | 232 |
| A056 | October 11, 2007 | Funding | 196 |
| M057 | December 5, 2007 | Section C.2 | 134 |
| A058 | November 8, 2007 | Funding | 148 |
| A059 | November 27, 2007 | Funding | 158 |
| M060 | March 24, 2008 | List B Update | 352 |
| M061 | December 20, 2007 | Section B.5 | 248 |
| A062 | January 8, 2008 | Funding | 150 |
| A063 | February 5, 2008 | Funding | 159 |
| M064 | August 6, 2008 | Sodium Bearing Waste Project | 159 |
| M065 | February 19, 2008 | Administrative Changes | 130 |
| A066 | March 18, 2008 | Funding | 166 |
| M067 | May 7, 2008 | Settlement of Impacts | 110 |
| M068 | April 8, 2008 | Administrative Changes | 75 |
| M069 | June 12, 2008 | Section C.3 | 91 |
| A070 | May 6, 2008 | Funding | 162 |
| M071 | June 12, 2008 | Section B.5 | 227 |
| A072 | June 18, 2008 | Funding | 181 |
| A073 | July 8, 2008 | Funding | 146 |
| Mod 074 | This number will not be used. | ||
| M075 | September 8, 2008 | Settlement of Impacts | 244 |
| A076 | August 8, 2008 | Funding | 152 |
| Mod 077 | This number will not be used. | ||
| Mod 078 | This number will not be used. | ||
| M079 | September 16, 2008 | Key Personnel | 75 |
| M080 | September 30, 2008 | Wage Determinations | 78 |
| A081 | September 24, 2008 | Funding | 287 |
| A082 | September 30, 2008 | Funding | 153 |
| A083 | October 16, 2008 | Funding | 157 |
| A084 | October 30, 2008 | Funding | 147 |
| Mod 085 | This number will not be used. | ||
| A086 | November 26, 2008 | Funding | 1440 |
| Mod 087 | December 16, 2008 | WAG 7 | 211 |
| Mod 088 | January 7, 2009 | Funding | 20 |
| Mod 089 | January 26, 2009 | Funding | 20 |
| Mod 090 | February 9, 2009 | FY09 B.5 and Key Personnel | 39 |
| Mod 091 | February 9, 2009 | Funding | 38 |
| Mod 092 | February 17, 2009 | Funding | 1673 |
| Mod 093 | March 9, 2009 | Funding | 16 |
| Mod 094 | March 18, 2009 | Funding | 16 |
| Mod 095 | March 23, 2009 | Funding | 16 |
| Mod 096 | April 1, 2009 | Funding | 16 |
| Mod 097 | April 15, 2009 | Recovery Act of 2009 | 178 |
| Mod 098 | April 21, 2009 | Funding | 86 |
| Mod 099 | May 11, 2009 | Funding | 110 |
| Mod 100 | June 11, 2009 | Recovery Act | 33 |
| Mod 101 | June 24, 2009 | Funding | 77 |
| Mod 102 | July 8, 2009 | Funding | 87 |
| Mod 103 | July 14, 2009 | Funding | 111 |
| Mod 104 | August 6, 2009 | Section B.5 | 614 |
| Mod 105 | August 13, 2009 | Funding | 268 |
| Mod 106 | August 27, 2009 | NQA-1 | 21 |
| Mod 107 | August 31, 2009 | Recovery Act Scope Definitization | 119 |
| Mod 108 | September 3, 2009 | Funding | 276 |
| Mod 109 | September 14, 2009 | Funding | 278 |
| Mod 110 | September 28, 2009 | Funding | 273 |
| Mod 111 | October 1, 2009 | Wag7 | 174 |
| Mod 112 | October 19, 2009 | List B | 90 |
| Mod 113 | October 19, 2009 | Funding | 111 |
| Mod 114 | November 12, 2009 | Project Management Info System | 1099 |
| Mod 115 | November 12, 2009 | Funding | 172 |
| Mod 116 | November 23, 2009 | ARRA Scope | 81 |
| Mod 117 | November 24, 2009 | ARRA Scope | 145 |
| Mod 118 | December 2, 2009 | New Clause | 126 |
| Mod 119 | December 7, 2009 | Funding | 253 |
| Mod 120 | December 22, 2009 | Funding | 171 |
| Mod 121 | December 23, 2009 | Settlement | 83 |
| Mod 122 | January 14, 2010 | Funding | 171 |
| Mod 123 | January 22, 2010 | Funding | 170 |
| Mod 124 | February 4, 2010 | Section H.4, Table H-2 | 123 |
| Mod 125 | February 11, 2010 | Funding | 162 |
| Mod 126 | March 5, 2010 | ARRA Scope | 135 |
| Mod 127 | March 17, 2010 | Funding | 163 |
| Mod 128 | March 31, 2010 | Section B.5 | 6687 |
| Mod 129 | April 1, 2010 | ARRA Scope | 331 |
| Mod 130 | April 8, 2010 | Funding | 160 |
| Mod 131 | April 16, 2010 | Funding | 163 |
| Mod 132 | April 29, 2010 | Section C.2 Changes | 219 |
| Mod 133 | April 30, 2010 | Funding | 160 |
| Mod 134 | May 5, 2010 | Settlement | 212 |
| Mod 135 | May 24, 2010 | Settlement | 141 |
| Mod 136 | May 25, 2010 | ARRA Scope | 242 |
| Mod 137 | May 26, 2010 | Funding | 160 |
| Mod 138 | May 26, 2010 | ARRA Scope | 173 |
| Mod 139 | June 3, 2010 | Funding | 162 |
| Mod 140 | June 9, 2010 | Settlement | 191 |
| Mod 141 | June 21, 2010 | Funding | 159 |
| Mod 142 | June 22, 2010 | ARRA | 240 |
| Mod 143 | June 24, 2010 | ARRA | 161 |
| Mod 144 | June 25, 2010 | Funding | 160 |
| Mod 145 | June 28, 2010 | ARRA | 145 |
| Mod 146 | July 29, 2010 | Funding | 160 |
| Mod 147 | August 4, 2010 | Section B.5 | 229 |
| Mod 148 | August 4, 2010 | ARRA Funding | 162 |
| Mod 149 | August 12, 2010 | Funding | 162 |
| Mod 150 | August 23, 2010 | ARRA Funding | 163 |
| Mod 151 | August 25, 2010 | Funding | 162 |
| Mod 152 | August 26, 2010 | ARRA Funding | 167 |
| Mod 153 | August 31, 2010 | Award Fee | 141 |
| Mod 154 | September 9, 2010 | ARRA | 215 |
| Mod 155 | September 28, 2010 | Settlement | 357 |
| Mod 156 | September 29, 2010 | Funding | 85 |
| Mod 157 | September 30, 2010 | Funding | 85 |
| Mod 158 | October 15, 2010 | Funding | 85 |
| Mod 159 | November 16, 2010 | ARRA Funding | 164 |
| Mod 160 | November 18, 2010 | Funding | 164 |
| Mod 161 | December 9, 2010 | Funding | 164 |
| Mod 162 | December 15, 2010 | List B | 871 |
| Mod 163 | December 22, 2010 | SBW Project | 598 |
| Mod 164 | December 22, 2010 | Funding | 164 |
| Mod 165 | January 10, 2011 | Administrative | 562 |
| Mod 166 | January 13, 2011 | Funding | 164 |
| Mod 167 | January 13, 2011 | Clarification | 720 |
| Mod 168 | January 27, 2011 | Funding | 162 |
| Mod 169 | February 2, 2011 | Section B.5 | 1748 |
| Mod 170 | February 24, 2011 | Funding | 162 |
| Mod 171 | March 2, 2011 | Funding | 162 |
| Mod 172 | March 7, 2011 | Settlement | 736 |
| Mod 173 | March 16, 2011 | Funding | 164 |
| Mod 174 | March 30, 2011 | Funding | 164 |
| Mod 175 | April 7, 2011 | Funding | 164 |
| Mod 176 | April 7, 2011 | List B | 113 |
| Mod 177 | April 14, 2011 | Wage Determinations | 168 |
| Mod 178 | April 27, 2011 | Funding | 165 |
| Mod 179 | May 26, 2011 | Funding | 166 |
| Mod 180 | June 6, 2011 | FRR/DRR and Calcine | 405 |
| Mod 181 | June 7, 2011 | ARRA | 184 |
| Mod 182 | June 24, 2011 | Funding | 166 |
| Mod 183 | July 12, 2011 | ARP Design | 387 |
| Mod 184 | July 22, 2011 | Funding | 167 |
| Mod 185 | August 5, 2011 | ARRA Funding | 167 |
| Mod 186 | August 16, 2011 | Funding | 165 |
| Mod 187 | August 23, 2011 | Funding | 190 |
| Mod 188 | August 31, 2011 | Funding | 190 |
| Mod 189 | August 31, 2011 | ARRA | 163 |
| Mod 190 | September 22, 2011 | Calcine | 254 |
| Mod 191 | September 28, 2011 | Funding | 39 |
| Mod 192 | September 28, 2011 | ARRA | 159 |
| Mod 193 | October 13, 2011 | Funding | 83 |
| Mod 194 | October 24, 2011 | List B; Section B.5 | 366 |
| Mod 195 | November 30, 2011 | Funding | 83 |
| Mod 196 | December 8, 2011 | ARRA | 169 |
| Mod 197 | December 15, 2011 | Funding | 83 |
| Mod 198 | December 21, 2011 | Administrative | 249 |
| Mod 199 | December 22, 2011 | Funding | 83 |
| Mod 200 | January 17, 2012 | Funding | 84 |
| Mod 201 | January 20, 2012 | Funding | 189 |
| Mod 202 | January 24, 2012 | Section B.5 | 296 |
| Mod 203 | February 3, 2012 | Funding | 165 |
| Mod 204 | February 3, 2012 | Section C | 1834 |
| Mod 205 | February 23, 2012 | Funding | 191 |
| Mod 206 | February 29, 2012 | Funding | 191 |
| Mod 207 | February 29, 2012 | Section C | 241 |
| Mod 208 | March 19, 2012 | Section C | 142 |
| Mod 209 | March 22, 2012 | Section J-D | 175 |
| Mod 210 | March 28, 2012 | Section C | 108 |
| Mod 211 | March 28, 2012 | Section C | 104 |
| Mod 212 | March 29, 2012 | Funding | 191 |
| Mod 213 | March 29, 2012 | Funding | 188 |
| Mod 214 | April 10, 2012 | Section C | 163 |
| Mod 215 | April 16, 2012 | Scope | 153 |
| Mod 216 | April 30, 2012 | Funding | 89 |
| Mod 217 | May 2, 2012 | Administrative | 83 |
| Mod 218 | May 8, 2012 | Funding | 186 |
| Mod 219 | May 24, 2012 | Funding | 107 |
| Mod 220 | May 24, 2012 | Funding | 106 |
| Mod 221 | June 14, 2012 | Funding | 107 |
| Mod 222 | June 28, 2012 | Strategic Sourcing | 113 |
| Mod 223 | July 11, 2012 | Funding | 83 |
| Mod 224 | July 11, 2012 | Changes | 108 |
| Mod 225 | July 17, 2012 | Funding | 83 |
| Mod 226 | August 13, 2012 | Changes | 450 |
| Mod 227 | August 20, 2012 | Funding | 102 |
| Mod 228 | August 22, 2012 | Funding | 191 |
| Mod 229 | August 22, 2012 | Funding | 83 |
| Mod 230 | August 30, 2012 | Funding | 105 |
| Mod 231 | September 25, 2012 | Extension -Section B -Section C (excluding C.8) -Section C.8 -Section J-Attachment A -Section J-Attachment B -Section J-Attachment C |
563 143 242 82 59 31 15 |
| Mod 232 | September 26, 2012 | Funding | 83 |
| Mod 233 | October 22, 2012 | Funding | 100 |
| Mod 234 | October 31, 2012 | Funding | 144 |
| Mod 235 | November 8, 2012 | Administrative | 174 |
| Mod 236 | November 14, 2012 | Section B.15 | 79 |
| Mod 237 | November 21, 2012 | Funding | 97 |
| Mod 238 | November 29, 2012 | Administrative | 172 |
| Mod 239 | December 17, 2012 | Funding | 97 |
| Mod 240 | January 16, 2013 | Funding | 97 |
| Mod 241 | January 28, 2013 | Administrative | 629 |
| Mod 242 | February 25, 2013 | Funding | 126 |
| Mod 243 | March 19, 2013 | Changes | 276 |
| Mod 244 | March 25, 2013 | Funding | 86 |
| Mod 245 | March 28, 2013 | Changes | 148 |
| Mod 246 | April 4, 2013 | Funding | 83 |
| Mod 247 | April 17, 2013 | Changes | 148 |
| Mod 248 | April 24, 2013 | Funding | 101 |
| Mod 249 | May 15, 2013 | Funding | 83 |
| Mod 250 | May 22, 2013 | Changes | 525 |
| Mod 251 | May 30, 2013 | Funding | 99 |
| Mod 252 | June 25, 2013 | Changes | 146 |
| Mod 253 | July 17, 2013 | Funding | 97 |
| Mod 254 | September 3, 2013 | Changes | 229 |
| Mod 255 | September 5, 2013 | Funding | 99 |
| Mod 256 | September 26, 2013 | Changes | 981 |
| Mod 257 | September 27, 2013 | Funding | 100 |
| Mod 258 | October 2, 2013 | Funding | 95 |
| Mod 259 | October 21, 2013 | Funding | 97 |
| Mod 260 | October 31, 2013 | Changes | 393 |
| Mod 261 | Not Issued | ||
| Mod 262 | November 7, 2013 | Funding | 97 |
| Mod 263 | November 18, 2013 | Changes | 132 |
| Mod 264 | November 21, 2013 | Funding | 97 |
| Mod 265 | November 25, 2013 | Funding | 95 |
| Mod 266 | December 6, 2013 | Funding | 95 |
| Mod 267 | December 19, 2013 | Funding | 95 |
| Mod 268 | January 23, 2014 | Changes | 181 |
| Mod 269 | January 31, 2014 | Funding | 95 |
| Mod 270 | February 13, 2014 | Funding | 95 |
| Mod 271 | March 13, 2014 | Funding | 86 |
| Mod 272 | March 26, 2014 | Changes | 119 |
| Mod 273 | March 28, 2014 | Funding | 86 |
| Mod 274 | April 30, 2014 | Funding | 86 |
| Mod 275 | May 29, 2014 | Funding | 86 |
| Mod 276 | June 25, 2014 | Funding | 104 |
| Mod 277 | June 30, 2014 | Funding | 96 |
| Mod 278 | July 2, 2014 | Funding | 96 |
| Mod 279 | July 31, 2014 | Funding | 96 |
| Mod 280 | August 14, 2014 | Funding | 99 |
| Mod 281 | August 18, 2014 | Changes | 236 |
| Mod 282 | August 27, 2014 | Funding | 100 |
| Mod 283 | September 15, 2014 | Changes | 353 |
| Mod 284 | September 18, 2014 | Changes | 812 |
| Mod 285 | September 30, 2014 | Funding | 100 |
| Mod 286 | October 16, 2014 | Funding | 103 |
| Mod 287 | October 29, 2014 | Changes | 221 |
| Mod 288 | November 6, 2014 | Funding | 102 |
| Mod 289 | December 11, 2014 | Funding | 102 |
| Mod 290 | December 23, 2014 | Funding | 102 |
| Mod 291 | January 8, 2015 | Funding | 102 |
| Mod 292 | January 22, 2015 | Funding | 105 |
| Mod 293 | January 29, 2015 | Funding | 92 |
| Mod 294 | February 2, 2015 | Changes | 242 |
| Mod 295 | February 11, 2015 | Funding | 89 |
| Mod 296 | February 26, 2015 | Funding | 87 |
| Mod 297 | March 11, 2015 | Changes | 115 |
| Mod 298 | March 30, 2015 | Funding | 87 |
| Mod 299 | April 15, 2015 | Funding | 87 |
| Mod 300 | April 21, 2015 | Changes | 164 |
| Mod 301 | May 14, 2015 | Funding | 87 |
| Mod 302 | June 3, 2015 | Funding | 87 |
| Mod 303 | June 25, 2015 | Funding | 87 |
| Mod 304 | June 30, 2015 | Changes | 160 |
| Mod 305 | July 1, 2015 | Test | 85 |
| Mod 306 | July 15, 2015 | Funding | 87 |
| Mod 307 | July 30, 2015 | Funding | 85 |
| Mod 308 | August 4, 2015 | Changes | 548 |
| Mod 309 | August 24, 2015 | Funding | 84 |
| Mod 310 | September 21, 2015 | Changes | 180 |
| Mod 311 | September 28, 2015 | Changes | 216 |
| Mod 312 | September 29, 2015 | ICP-III Extension | 468 |
| Mod 313 | September 29, 2015 | Funding | 87 |
| Mod 314 | October 13, 2015 | Funding | 87 |
| Mod 315 | October 29, 2015 | Changes | 175 |
| Mod 316 | October 30, 2015 | Funding | 88 |
| Mod 317 | November 25, 2015 | Funding | 84 |
| Mod 318 | December 23, 2015 | Funding | 87 |
| Mod 319 | January 7, 2016 | ICP-II Target Cost and Target Fee adjustment | 76 |
| Mod 320 | January 28, 2016 | Funding | 86 |
| Mod 321 | February 9, 2016 | Changes | 633 |
Last Update:
03/28/2019
|